Method 2 | Method 3 | Method 5 | Method 6 | Method 8A | Method 17 | Method 23 | Method 29| Method 201A/PM10
Boiler/ Combustion Services | Testing Services | Personel | Equipment | Testing Methods | Training | Safety | Quality | Pollutants
Services and Pricing | On-Site Testing | Quality | Guarantee
Process Consulting | Compliance Consulting | Permitting
Analyzers | Accessories | Gas Analyzers | CEM Equipment | Flow | Gas Conditioning | Heated Sample Lines | Sample Recovery | Source Sampling
On-Line Catalog | Used Equipment Sales USA | Used Equipment Sales Europe | MSDS Database | Credit Application | Rental Terms | Gas Cylinder Database
subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link
subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link
subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link

 

CleanAir Expresssmall logo

Replacement Pitot for Assemblies
Method 2
Geometric calibration is included with replacement pitot. 1/4" O. D. Stainless Steel Tube Construction.
Part Number
03-Length (#0306E = 6 Ft. Replacement Pitot)
Note: Lengths indicate effective length. To determine overall length add 6"
Air Testing | Analytical | Consulting | Express Sales | Rentals | ©2005 CleanAir Engineering