Method 2 | Method 3 | Method 5 | Method 6 | Method 8A | Method 17 | Method 23 | Method 29| Method 201A/PM10
Boiler/ Combustion Services | Testing Services | Personnel | Equipment | Testing Methods | Training | Safety | Quality | Pollutants
Services and Pricing | On-Site Testing | Quality | Guarantee
Process Consulting | Compliance Consulting | Permitting
Analyzers | Accessories | Gas Analyzers | CEM Equipment | Flow | Gas Conditioning | Heated Sample Lines | Sample Recovery | Source Sampling
On-Line Catalog | Used Equipment Sale | MSDS Database | Credit Application | Rental Terms | Gas Cylinder Database
subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link
subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link

 

Clean Air Equipment Sales (800) 223-3977 small logo

Impinger Outlet
Method 5- Isokinetic

The impinger outlet is connected to the last impinger in the sample train and provides a rigid mount for the sample umbilical. Designed to fit the quick release clamp on the Clean Air Express impinger compartments. Stainless steel construction, 28/12 ball joint socket inlet connection, Brass check valve, 3/8" tube or ½" quick connect outlet connection and ¼" type K thermocouple.

Part Number
Item
0034
Impinger Outlet 3/8" tube outlet connection
0034QC
Impinger Outlet 1/2" Quick Connect outlet
Air Testing | Analytical | Consulting | Express Sales | Rentals | Contact Us | ©2008 Clean Air Engineering