Method 2 | Method 3 | Method 5 | Method 6 | Method 8A | Method 17 | Method 23 | Method 29| Method 201A/PM10
Boiler/ Combustion Services | Testing Services | Personnel | Equipment | Testing Methods | Training | Safety | Quality | Pollutants
Services and Pricing | On-Site Testing | Quality | Guarantee
Process Consulting | Compliance Consulting | Permitting
Analyzers | Accessories | Gas Analyzers | CEM Equipment | Flow | Gas Conditioning | Heated Sample Lines | Sample Recovery | Source Sampling
On-Line Catalog | Used Equipment Sale | MSDS Database | Credit Application | Rental Terms | Gas Cylinder Database
subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link
subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link

 

Clean Air Equipment Sales (800) 223-3977 small logo

Replacement Pitot for Probe Assemblies
Method 5- Isokinetic

Geometric calibration included with replacement pitot. Note: Lengths indicate effective length. To determine overall length add 6". Custom order lengths are also available.
Materials of construction: (S) stainless steel (I) Inconel (Titanium)

Part Number
Material
Item
0304-P-
(S), (I), (Titanium)
4' Replacement Pitot
0306-P-
(S), (I), (Titanium)
6' Replacement Pitot
0308-P-
(S), (I), (Titanium)
8' Replacement Pitot
0310-P-
(S), (I), (Titanium)
10' Replacement Pitot
0312-P-
(S), (I), (Titanium)
12' Replacement Pitot
Air Testing | Analytical | Consulting | Express Sales | Rentals | Contact Us | ©2008 Clean Air Engineering